.

Jan2013 LEA 2nd Placer

Arch. Florence Ann Reyes from UP Diliman placed second in the January 2013 Architects Licensure Exam.

Jan2013 LEA 4th Placer

Arch. Jose Crisanto C. Estrella III from UST placed fourth in the January 2013 Architects Licensure Exam..

Jan2013 LEA 5th Placer

Arch. Sean Lemuel T. Su from UP Diliman placed fifth in the January 2013 Architects Licensure Exam.

Jan2013 LEA 5th Placer

Arch. Mary Joan D.C. Allas from UP Diliman placed fifth in the January 2013 Architects Licensure Exam.

Jan2013 LEA 6th Placer

Arch. Jose Ignacio Q. Faustino from UST placed sixth in the January 2013 Architects Licensure Exam.

Jan2013 LEA 7th Placer

Arch. Tito P. Robles Jr. from TIP-Manila placed seventh in the January 2013 Architects Licensure Exam.

Jan2013 LEA 8th Placer

Arch. Alvin D.L. Cruz Trinidad from UP-Diliman placed eighth in the January 2013 Architects Licensure Exam.

Jan2013 LEA 9th Placer

Arch. Rhozela Angelica T. Tesoro from UP-Diliman placed ninth in the January 2013 Architects Licensure Exam.

Jan2013 LEA 10th Placer

Arch. Ma. Angelica S. Coquilla from Ateneo de Davao University placed ninth in the January 2013 Architects Licensure Exam.

June2012 LEA 4th Placer

Arch. Angela Azalea L. Dalumpines from UP-Diliman placed fourth in the June 2012 Architects Licensure Exam.

Monday, June 3, 2013

Program of the June 2013 Architect Licensure Examination

The Professional Regulatory Board of Architecture announces the program of the June 2013 Architect Licensure Examination also known as June 2013 Architects Board Exam on June 7 and 9, 2013 in Manila, officially released by the Professional Regulation Commission (PRC).

Deadline of filing of application is until May 20, 2013

Schedule and Program of examination:
DATE AND TIME
SUBJECTS
WEIGHT
FRIDAY, JUNE 7, 2013
7:00 A.M. – 7:45 A.M
GENERAL INSTRUCTIONS AND FILING UP OF FORMS
8:00 A.M. – 1:0 P.M.
HISTORY AND THEORY OF ARCHITECTURE; PRINCIPLES OF PLANNING; ARCHITECTURE PRACTICE

30%
2:00 P.M. – 7:00 P.M.
UTILITIES SYSTEMS / STRUCTURAL CONCEPTUALIZATION / BUILDING MATERIALS AND CONSTRUCTION
30%
SUNDAY, JUNE 9, 2013
8:00 A.M. – 6:00 P.M.
ARCHITECTURAL DESIGN AND SITE PLANNING
40%


GENERAL INSTRUCTIONS:
  1. Your school/building assignment will be posted at the PRC premises one to two working days before the examination. Bring your Notice of Admission when you verify your school/building assignment. Visit your school/building assignment prior to the day of the examination.

  2. Report to the school/building assignment before 6:30am on the first day of examination to verify your room and seat number. Be punctual,late examinees will not be admitted. Examination fee of absent examinees will be forfeited.

  3. Examinees are required to wear the following attire every examination day:

    • Male Examinees        -  White polo shirts or T-shirts with collar, tucked-in
    • Female Examinees     -  White blouses or T-shirt with collar 

  4. Bring the following on examination day:

    • Notice of Admission
    • Application's Stub
    • Official Receipt
    • One piece metered-stamped window mailing envelope
    • Two or more pencils (No. 2)
    • Ball pen with BLACK ink only
    • One piece long brown envelope
    • One piece long transparent/plastic envelope (for keeping your valuables and other allowed items)
    • Non-Programmable Calculators (refer to list on the Examinees Guide).

  5. The following are PROBIHITED inside the examination premises/rooms

    • Books, notes, review materials, and other printed materials containing coded data/information/formula
    • PROGRAMMABLE CALCULATORS
    • CELLULAR PHONES, beepers, protable computers or similar gadgets/devices.
    • Bags of any kind (ladies bag, shoulder bags, attache case, backpacks, etc.
    • Other examination aides not stated on this program shall not be brought inside the examination building.

    NOTE: PRC will not be answerable for prohibited items that will be lost.

  6. Read carefully and follow the instruction on your Notice of Admission and EXAMINEES GUIDE.
SPECIAL INSTRUCTIONS:
  1. On the second day (June 9, 2013), every candidate is required to bring to the examination room architect scales (English and Metric Scales), 30 x 60 and 45 degree triangles, protractors, calculators, pencils, drawing pens, erasers, graphed paper and other tools for sketching purposes.
  2. Download copy of Rules VII and VIII of the 2004 Revised IRR of P.D. No. 1096 "1977 National Building Code of the Philppines (NBCP)
  3. Free download only from the Latest Publication Section of PRBoA Website.
  4. Candidates will not be allowed to leave the examination rooms, borrow anything or communicate with one another on any subject matter. Every candidate is required to bring his/her lunch and or supply (placed inside transparent/plastic bags) with him/her during examination. No foo of any kind carried by any persons intended for any candidate during the progress of the examination shall be entertained by watchers or recieved by any candidate.

The Professional Regulation Commission (PRC) announces the list of room assignments of the examinees in June 2013 Architect Licensure Examination also known as June 2013 Architect Board exam to be held in Manila on June 7 & 9, 2013 and administer by Professional Regulatory Board of Architecture. The said examination room assignments is available here, once officially released by the PRC.

INSTRUCTIONS:
  1. Examinees should report before 6:30 in the morning every examination day. LATE EXAMINEES WILL NOT BE ADMITTED.

  2. Bring the following: Notice of Admission (NOA), Official Receipt, pencils no. 1 or 2,  black ball pens, metered-stamped window mailing envelope, long brown and long plastic envelopes.

  3. CELLULAR PHONES AND OTHER ELECTRONIC GADGETS ARE STRICTLY PROHIBITED.

  4. Wear the prescribed dress code.
Architect Board Exam Room Assignment:

-Not yet available-

Thursday, March 28, 2013

Building Materials & Construction Quiz 2

Here's Part 2 of Building Materials and Methods of Construction Quiz.

There will be 30 questions randomly picked from a database of 200+ questions.
Each time you take the quiz, there will be different questions appearing. Enjoy!!!



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a longer quiz consisting of 50 random questions.



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a much longer quiz consisting of 75 random questions.



Take the Exam again HERE.

Large screen setup HERE


Building Utilities Quiz 2

Here's Part 2 of Utilities Quiz - Mechanical. Electrical, Auxiliary Systems and Lighting & Acoustics of buildings.

There will be 30 questions randomly picked from a database of 200+ questions.
Each time you take the quiz, there will be different questions appearing. Enjoy!!!



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a longer quiz consisting of 50 random questions.


Planning Quiz 1: Site Planning, Urban Design & Urban Planning

Here's Part 1 of Site Planning, Urban Design & Urban Planning Quiz for your exercise.

There will be 30 questions randomly picked from a database of 200+ questions.
Each time you take the quiz, there will be different questions appearing. Enjoy!!!



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a longer quiz consisting of 50 random questions.



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a much longer quiz consisting of 75 random questions.



Take the Exam again HERE.

Large screen setup HERE

BldgLaws Quiz 4: Fire Code Quiz

Here's Part 2 of Building Laws Quiz focusing on RA9514- the Fire Code of the Philippines for your exercise.

There will be 30 questions randomly picked from a database of 200+ questions.
Each time you take the quiz, there will be different questions appearing. Enjoy!!!



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a longer quiz consisting of 50 random questions.



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a much longer quiz consisting of 75 random questions.



Take the Exam again HERE.

Large screen setup HERE

ProfPrac Quiz 3

Here's a short quiz consisting of 30 questions for Professional Practice.

Write down your answers after each question on a piece of paper. The answers can be found at the end of the presentation.



Passing score is 15 or 75%
26-30 = Excellent
21-25 = Very Good
16-20 = Good
11-15 = Some More Review
6-10 = Double your effort
1-5 = You're in trouble

ProfPrac Quiz 2

Here's a short quiz consisting of 30 questions for Professional Practice.

Write down your answers after each question on a piece of paper. The answers can be found at the end of the presentation.



Passing score is 15 or 75%
26-30 = Excellent
21-25 = Very Good
16-20 = Good
11-15 = Some More Review
6-10 = Double your effort
1-5 = You're in trouble

BldgLaws Quiz 3: Fire Code Part 2

Here's a short quiz consisting of 30 questions regarding RA 9514-the Fire Code of the Philippines.

Prepare your paper and write down your answers after each question. The answers can be found at the end of the presentation.



Passing score is 15 or 75%
26-30 = Excellent
21-25 = Very Good
16-20 = Good
11-15 = Some More Review
6-10 = Double your effort
1-5 = You're in trouble

BldgLaws Quiz 3: Fire Code Part 1

Here's a short quiz consisting of 30 questions regarding RA 9514-the Fire Code of the Philippines.

Prepare your paper and write down your answers after each question. The answers can be found at the end of the presentation.



Passing score is 15 or 75%
26-30 = Excellent
21-25 = Very Good
16-20 = Good
11-15 = Some More Review
6-10 = Double your effort
1-5 = You're in trouble

MOA between UAP and PICE

Year 2003. The UAP and PICE signed a joint resolution supporting the passage of Architecture and Civil Engineering bills delineating their respective scope of practice and strengthening their collaborative efforts in common goals.
The two professional groups through their leaders stressed the need for the immediate passage of their respective bills, which would benefit their hundreds of thousand members nationwide.
In Year 2004, the Architecture Act was passed and signed into law.
In Year 2005, a petition for declaratory relief filed on 3 May 2005 by the PICE and civil engineer Leo Cleto Gamolo to declare null and void Sections 302[3] and [4] of the Revised Implementing Rules and Regulations (“Revised IRR”) of Presidential Decree No. 1096 (the “National Building Code”). The said provisions require that architectural documents submitted in applications for building permits must be prepared, signed and sealed by architects. PICE, et al. claim that the said sections of the Revised IRR, by effectively prohibiting civil engineers from also preparing, signing and sealing architectural documents, are contrary to the National Building Code and the Republic Act No. 544 (the “Civil Engineering Law”), which purportedly gave civil engineers the said right.

UAP and PICE Collaboration

The following is a copy of proposed MOA for the UAP and PICE sent by an anonymous sender

ARCHITECTURE AND CIVIL ENGINEERING – COMPLEMENTARY PROFESSIONS
DRAFT MEMORANDUM OF AGREEMENT BETWEEN UAP AND PICE
Whereas each recognizes the other as an honoured and learned profession of equal merit whose close cooperation is essential for the benefit of the public, and in order to ensure that the special knowledge, skill and training of each profession are properly available to the public, the following points have been duly agreed upon by the Philippine Institute of Civil Engineers (PICE) and the United Architects of the Philippines (UAP) concerning the scope and practice of architecture and civil engineering for buildings
1. Principles Governing the Practice of Civil Engineering and Architecture
(a) Except as provided herein, Civil Engineers shall confine their professional activity to the practice of civil engineering and Architects to the practice of architecture.
(b) Civil Engineers and Architects are obligated to practise with professional integrity in their areas of competence in all types and sizes of buildings to the prevailing professional standards.
2. Definitions
In this Memorandum of Agreement
(a) Architect means an individual registered as an Architect under the Architecture Act of 2004.
(b) Architectural and Engineering Firm means a proprietorship, partnership or corporation that is entitled to engage in the practice of architecture or the practice of engineering under the
Architecture Act of 2004 or the Civil Engineering Act of 2012, as the case may be, and whose practice, if not so confined, involves the design of buildings and is satisfactory to the Joint Practice Board.
(c) Architectural Firm means a proprietorship, partnership or corporation that is entitled to engage in the practice of architecture under the Architecture Act of 2004 and whose practice is the provision of architectural consulting services.
(d) Assembly Occupancy means the occupancy or the use of a building, or part thereof, by a gathering of persons for civic, political, travel, religious, social, educational, recreational or like purposes, or for the consumption of food or drink.
(e) Building means any structure used or intended for supporting or sheltering any use or occupancy.
(f) Certificate of Joint Practice means a document issued either by UAP or PICE, respectively, to individuals, proprietorships, partnerships and corporations to authorize practice in the design of buildings and, providing the conditions imposed on granting of the certificate remain unchanged, shall remain valid for (1) year from the date of issuance.
(g) Coordinating Registered Professional means the Architect or Civil Engineer retained to coordinate all the design and field reviews of the Architects and Civil Engineers retained on a building.
(h) Civil Engineer means an individual registered as a Civil Engineer under the Civil Engineers Act of 2012.
(i) Civil Engineering Firm means a proprietorship, partnership or corporation entitled to engage in the practice of civil engineering under the Civil Engineers Act of 2012 and whose practice is the provision of civil engineering consulting services.
(j) Industrial Occupancy means the occupancy or use of a building, or part thereof, for the assembling, fabricating, manufacturing, processing, repairing or storing of goods and materials.
(k) Joint Practice Board means a body established jointly by UAP and PICE under Article 14.
(l) Major Occupancy means the principal occupancy for which a building, or part thereof, is used or intended to be used, and is deemed to include the subsidiary occupancies, which are an integral part of the principal occupancy.
(m) Occupancy means the use or intended use of a building, or part thereof, for the shelter or support of persons, animals or property.
(n) Prime Consultant means the individual, proprietorship, partnership or corporation who or which is directly responsible to a client for the execution of architectural and civil engineering work performed in the design and field review of a building.
3. Principles Governing the Joint Practice of Civil Engineering and Architecture
(a) In the design of buildings, Civil Engineering Firms shall have a Certificate of Joint Practice from UAP if their professional activity includes the practice of civil engineering and architecture;
Architectural Firms shall have a Certificate of Joint Practice from PICE if their activity includes the practice of architecture and civil engineering.
(b) Civil Engineers may be employed by Architects and Architectural Firms and Architects may be employed by Civil Engineers and Civil Engineering Firms.
4. Principles Governing the Choice of Prime Consultant and Coordinating Registered Professional
(a) A client is free to select the Prime Consultant of the client’s choice.
(b) A client is free to select the Coordinating Registered Professional of the client’s choice.
5. Building Occupancies
Building Occupancies for which any architectural services provided by a Civil Engineer shall be deemed to be incidental and ancillary to the practice of civil engineering are:
(a) Major industrial occupancies, which may include up to 275m² of floor area of a subsidiary assembly occupancy or up to 600m² of floor area of any other subsidiary occupancy.
(b) Major industrial occupancies of an individual tenancy within a multi-tenant building, which may include up to 275m² of floor area of a subsidiary assembly occupancy or up to 600m² of floor area of any other subsidiary occupancy. Nothing in this clause shall permit a Civil Engineer to enable someone who is not an Architect or a Civil Engineer to provide architectural services.
6. Buildings for which any engineering services provided by an Architect shall be deemed to be incidental and ancillary to the practice of architecture are:
(a) Buildings of business and personal services, mercantile, medium-hazard industrial or low-hazard industrial occupancy up to a maximum of two storeys in building height and up to 600m² of floor area; and
(b) Buildings of residential occupancy up to a maximum of three storeys in building height and up to 600m² of floor area. Nothing in this clause shall permit an Architect to provide engineering services for components which require structural design, as opposed to selection from building code tables.
7.
For building occupancies other than those covered by Articles 5 and 6, whose design and field review require, by law, the services of both Architects and Civil Engineers:
(a) Architects will be required to provide architectural services other than those which are necessarily incidental and ancillary to the civil engineering work.
(b) Civil Engineers will be required to provide civil engineering services other than those which are necessarily incidental and ancillary to the architectural work. Nothing in paragraphs 7(a) and 7(b) above shall prevent an Architect or Civil Engineer from showing on drawings the civil engineering or architectural aspects necessary for coordination purposes.
8.
(a) A Civil Engineer’s entitlement to provide incidental and ancillary architectural services shall not permit a Civil Engineer to perform all architectural services in connection with a building requiring the services of both professions.
(b) An Architect’s entitlement to provide incidental and ancillary engineering services shall not permit an Architect to perform all engineering services in connection with a building requiring the services of both professions.
9. Signing and Sealing of Drawings
(a) Architectural drawings for buildings shall be signed and sealed by an Architect (except as permitted under Article 5).
(b) Civil Engineering drawings for buildings shall be signed and sealed by Civil Engineer (except as permitted under Article 6).
10. The Practice of Civil Engineering and Architecture by Architectural Firms
An Architectural Firm shall be entitled to a Certificate of Joint Practice from PICE provided that it employs on a full-time basis one or more Civil Engineers who shall take responsibility for engineering work. The Certificate of Joint Practice granted under these circumstances entitles the Architect or Architectural Firm to hold themselves out as Architect(s) and Civil Engineer(s).
11. The Practice of Civil Engineering and Architecture by Jointly Owned Firms
A proprietorship, partnership or corporation owned by Civil Engineers and Architects, who are respectively, members of PICE and UAP, is entitled to practise both engineering and architecture under the Civil Engineers Act 0f 2012 and the Architecture Act of 2004.
12. The Practice of Civil Engineering and Architecture by Civil Engineering Firms
A Civil Engineering Firm shall be entitled to a Certificate of Joint Practice from UAP provided that it employs on a full-time basis one or more Architects who shall take responsibility for architectural work. The Certificate of Joint Practice granted under these circumstances entitles the Civil Engineer or Civil Engineering Firm to hold themselves out as Civil Engineer(s) and Architects(s).
13. Disciplinary Provisions
(a) An Architectural Firm that has been issued a Certificate of Joint Practice by PICE to practise engineering shall be subject to the disciplinary provisions of the Civil Engineers Act of 2012, Bylaws and Code of Ethics.
(b) An Engineering Firm that has been issued a Certificate of Joint Practice by UAP to practise architecture shall be subject to the disciplinary provisions of the Architecture Act, Bylaws and
Code of Ethics.
(c) A Certificate of Joint Practice issued by UAP or PICE to a proprietorship, partnership or corporation may be revoked for cause by the issuing authority.
14.
The Joint Practice Board
Concurrent with the execution of this Memorandum of Agreement, there shall be instituted a Joint Practice Board authorized to deal with matters of common concern and jurisdiction and to make recommendations to UAP and PICE. The Board shall be composed of an equal number of Architects and Civil Engineers appointed by UAP and PICE, respectively. The Chair shall be appointed by mutual consent. Each member of the Joint Practice Board shall have one vote.
15.
The terms of reference of the Joint Practice Board shall include:
(a) working on matters of interprofessional relations, including, for example, the coordination and publication of guidelines, standards, criteria and performance standards in the field of building design and construction, formulated either jointly or severally by UAP and PICE;
(b) reviewing the terms of this Agreement and, from time to time as necessary, recommending changes to the points of this Agreement for consideration by the Councils of UAP and PICE; and
(c) such other matters as may be decided from time to time by UAP and PICE together.
16. Modification of this Memorandum of Agreement
It is agreed that this Memorandum of Agreement may be modified at any time by mutual consent of the Councils of UAP and PICE.
17. Terms of this Memorandum of Agreement
This Memorandum of Agreement shall remain in force by the mutual consent of the Councils of PICE and UAP.
18. Implementation of this Memorandum of Agreement
(a) It is understood by UAP and PICE that amendments to the Architecture Act of 2004 and the Civil Engineers Act of 2012 will be required in concert to facilitate enforcement of this or a subsequent Memorandum of Agreement.
(b) It is understood and agreed that the success and effectiveness of this Memorandum of Agreement will depend largely on goodwill between UAP and PICE.
(c) It is understood and agreed that (while some situations will be resolved on their own merit)
UAP and PICE generally will view contravention of the other association’s statute to constitute unprofessional conduct.
Entered into this ___ day of ____2012, at Manila Philippines.
_________________ (UAP President) _________________(PICE President)
United Architects of the Philippines and Philippine Institute of Civil Engineers

Regional Trial Court Ruling

Compare the decision of the Court of Appeals with the initial ruling made by the Manila Regional Trial Court Branch 22 that validated the questioned provisions, specifically paragraphs 3 and 4 of Section 302 of the Revised Implementing Rules and Regulations (IRR) of Presidential Decree 1096, otherwise known as the National Building Code of the Philippines.

RTC Decision

Court Order

Court of Appeals Decision regarding signing of architectural plans

Here is the controversial CA Decision that has angered many Architects.

The Court of Appeals, in its Decision dated 5 January 2012, granted the appeal of PICE and reversed the Decision of the Regional Trial Court.

Here's a copy of the decision:

Part 1

Decision Re Uap - Part 1 by Rey Gabitan



Part 2

Decision Re Uap - Part 2 by Rey Gabitan

Determining Allowable Maximum Volume of Building (AMVB)

ALLOWABLE MAXIMUM VOLUME OF BUILDING (AMVB) Above-Grade – The limit of the total volume of space that can be occupied by a proposed building/structure above grade level. the AMVB is an imaginary prism within the fully enclosed areas and courts of a proposed building/structure shall fit.

Quantifying the AMVB. The AMVB shall be primarily determined by the following:

a. Multiply the AMBF (in square meters) for the lot by the applicable BHL (in meters) for the lot to arrive at the initial AMVB (in cubic meters); the result of this step is the imaginary footprint prism;

b. Superimpose the angular plane originating from the center of the RROW on the footprint prism; this shall result in the reduction of the initially computed building volume due to the application of incremental setbacks and of roof configuration dictated by the angular plane; the result of this step is the AMVB;

c. To crosscheck the AMVB against the Allowable Maximum TGFA (separately determined), convert the AMVB into its approximate area equivalent (in sq. meters) by dividing it with the BHL. Before converting the AMVB to its area component, check for the effects of the incremental setbacks on the TGFA for each floor of the proposed building/structure.



ENROLL NOW AT THE UAP CENTER FOR CAREER DEVELOPMENT FOR A COMPREHENSIVE REVIEW ON RULES 7 & 8 DEVELOPMENT CONTROLS!!! CONTACT 02-4126364 or Email: uapcommunication@yahoo.com

Determining AMBF & PSO (R-1 & R-2)

The following rules shall be observed in the determination of the Allowable Maximum Building Footprint (AMBF) for buildings and related habitable structures. If the stated rules are compared with

a) Rule VIII Table VIII.1.- Reference Table on Percentage of Site Occupancy and Maximum Allowable Construction Area (MACA);

b) Rule VIII Tables VIII.2. and VIII.3. (setbacks, yards and courts); or

c) with the applicable stipulations under this Rule and with the applicable stipulations of the Fire Code,

the more stringent but applicable regulation out of the aforementioned rules should be observed.



ENROLL NOW AT THE UAP CENTER FOR CAREER DEVELOPMENT FOR A COMPREHENSIVE REVIEW ON RULES 7 & 8 DEVELOPMENT CONTROLS!!! CONTACT 02-4126364 or Email: uapcommunication@yahoo.com

History and Theory of Architecture Quiz 1

Here's Part 1 of History and Theory of Architecture Quiz.

There will be 30 questions randomly picked from a database of 300+ questions.
Each time you take the quiz, there will be different questions appearing. Enjoy!!!



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a longer quiz consisting of 50 random questions.



Take the Exam again HERE.

Large screen setup HERE

OR you may want to take a much longer quiz consisting of 75 random questions.



Take the Exam again HERE.

Large screen setup HERE